爱操在线-爱操在线视频-爱操综合-爱插网-日本成人黄色网址-日本成人免费在线视频

Welcome to Zhucheng baixin machinery co. LTD website!

What is the operation procedure of sterilizing pot?
Auther:1242 Pubdate:2019-11-01 07:14:01
The operation process of sterilizing pot is very rigorous, and it needs to operate according to strict indicators. Bainxin machinery has sorted out a detailed step for you here:
 
First is the product ready, with food cart to the pot, and then put the pot had closed the door, and open, the inflatable cushion valve on the right side of security even closed the valve, the water into the pan, open the POTS and pans on the connected valves, put on the tank water all in a pot, at the time of water, open the valve on the boiler safety chain on the right side of the door, after closing drain, open the drain valve exhaust pipe water next to the blue valve.
 
Turn on the pressure automatic switch to fill the pot with about 0.05mpa pressure and then turn off. Open the circulating water pump, open the temperature automatic switch, open the trap switch to heat up the pot, and observe the drainage of the blue valve next to the trap. When the blue valve is not drained and starts to exhaust, close the blue valve.
 
After waiting for the temperature in the pot to display 100℃, the pressure automatic switch is turned on and the timer is adjusted. When waiting for the temperature to rise to the predetermined temperature, the time relay starts timing and enters the sterilization stage.
 
When the sterilizing time is reached, the buzzer will alarm. At this time, turn off the temperature automatic switch and turn off the steam trap.
 
Open the water inlet valve, in which the valve at the upper end should be small, open the blue valve and turn off the water flow, open the cooling pump, and then observe the pressure of the pressure gauge. If the pressure drops, turn off the water pump and wait for the pressure to be filled before opening until the pressure remains stable, and let the cooling pump keep running.
 
Turn off the pressure automatic switch when waiting for the temperature in the pot to show about 60 ℃. Turn off the circulating pump and cooling pump when the temperature shows about 40 ℃. Open the connecting valve of the upper tank and recycle the water into the tank. When the recycling is finished, there will be a sound of exhaust. At this time, close the valve.
 
Open the drain valve to let out all the air and water, and don't forget to turn it off.
 
After the safety chain head above the pot door falls off, open the right chain valve, close the inflatable mat valve and open the exhaust valve, open the pot door and take out the product with the food truck.
 
Zhucheng baixin machinery co., LTD mainly produces various stainless steel cooking equipment, frying equipment, sterilization equipment, anti-corrosion tank, halogen products processing line, vegetable processing line, pasteurization line and drying equipment.
主站蜘蛛池模板: 国产98在线传媒在线视频 | 国产在线观看www鲁啊鲁免费 | 亚洲成人三级电影 | 四虎影院免费在线 | 午夜视频久久 | 男女免费在线视频 | 一区国产传媒国产精品 | 成年人看的毛片 | 亚洲激情视频网站 | 天天综合天天色 | 在线视频三区 | 久久成人综合网 | 亚洲国产第一区二区香蕉 | 日本免费人成黄页网观看视频 | 在线资源网 | 色月| 天天摸天天碰成人免费视频 | 欧美丝妇| 亚欧免费视频 | 免费一级特黄特色黄大任片 | 美女扒开尿口让男人桶 | 人人爽影院 | 亚洲天天综合网 | 国产午夜免费 | 亚洲1页 | 好大好硬好长好爽a网站 | 亚洲综合色婷婷中文字幕 | 亚欧毛片基地国产毛片基地 | 99亚洲精品卡2卡三卡4卡2卡 | 综合婷婷丁香 | 天天色影院 | 三级网站在线免费观看 | 天堂中文资源在线观看 | 性殴美高清视频 | 天天综合天天做 | 天天爱天天插 | 在线观看免费视频资源 | 国产精品久久久久久久人热 | 国产香蕉视频在线播放 | 在线观看视频一区 | 福利视频999 |